Second Asia Airfreight Terminal in Hongkong tripled capacity
World’s tallest elevating transfer vehicles in China
Project details
- Client: AAT
- Location: Asia Airfreight Terminal, Hong Kong
- Completion date: December 2006
- Capacity: 910,000 t
- Busy day handling capacity: 4,000 t/day
- System: Fully automated ULD and cargo storage system
Equipment/components details
- 4 x 10 ft 13 level Elevating transfer vehicles ETVs (height: 43 m)
- 9 x Stacker cranes (height: 30 m)
- 2,500 Pallet positions
- 1,850 ULD storage positions
- 7 Transfer vehicles
- 38 Fixed workstations
- 5 Vertical (hoist) conveyors
- 45 Airside Dolly docks
- 6 Landside Truck docks
- 5 Cool room positions
- 9 10ft and 1 20ft Elevating workstations
- 956 10ft Storage positions