Customer Success Stories
-
RegionPlease select...
-
CityPlease select...
-
Product Group
-
Product TypePlease select...
-
ProductPlease select...

Lödige delivered a multi-level material handling system for a new AAT cargo terminal. Terminal 2 is capable of handling 910,000 tonnes per annum, with peak day loadings of 4,000 tonnes. It comprises four floor levels with a total floor area of approx. 117,000 sqm.
Read more Read more
In 2018, Lödige Industries delivered an automated parking system for the BLOX building in Copenhagen. The building was designed by Ellen van Loom of the Dutch Office for Metropolitan Architecture (OMA) and houses the Danish Architecture Centre. The system is providing parking spaces for…
Read more Read more
Lödige Industries has secured a contract from SSR-Performance to deliver an automated car storage system. The 141-space facility in Munich, Germany is billed to be the most modern automated system aimed at luxury and classic car owners.
Read more Read more
The warehouse was newly built, but in order to facilitate any subsequent conversion of the building, civil works were not allowed to be carried out on the floor. Hence, it was necessary to find a solution which would not require a pit.
Read more Read more
At the end of 2015 a passenger and goods lift was installed for Libri. The customer needed a lift which would enable the transportation of goods and passengers up to 9.5 m with 4 stops. Furthermore, it was required to find a solution to easily install within an existing warehouse.
Read more Read more